All
A recent regent's meeting a group of upgrades to UM included some work to Yost- http://regents.umich.edu/meetings/11-14/2014-11-IX-9.pdf
One was a change to the ice suraface. Any idea what that is? I thought that a lot of that was included in the most recent updates to Yost. Also, upgrading the refrigeration system. Again, I thought that was done recently.
We'll get new dasher boards, and a new roof on the north end.
All for the low price of $5.8M.
(to me, that's a LOT- mostly because my brother is trying to put a full sized rink in Moscow, ID, one that would be workable for a small WCHA type team- and that would very easily put up the entire rink. Twice according to him.)
I assume that this would happen next summer. And something that none of us would ever notice. Much like putting in a new foundation to your house for $30k...
A recent regent's meeting a group of upgrades to UM included some work to Yost- http://regents.umich.edu/meetings/11-14/2014-11-IX-9.pdf
One was a change to the ice suraface. Any idea what that is? I thought that a lot of that was included in the most recent updates to Yost. Also, upgrading the refrigeration system. Again, I thought that was done recently.
We'll get new dasher boards, and a new roof on the north end.
All for the low price of $5.8M.
(to me, that's a LOT- mostly because my brother is trying to put a full sized rink in Moscow, ID, one that would be workable for a small WCHA type team- and that would very easily put up the entire rink. Twice according to him.)
I assume that this would happen next summer. And something that none of us would ever notice. Much like putting in a new foundation to your house for $30k...